# How to Build a Shed Ramp

Source: https://firsthomefixes.com/guides/how-to-build-a-shed-ramp/
Summary: Learn how to build a shed ramp: set the slope, frame a plywood deck and add grip strips so a mower rolls in easily.
Difficulty: Moderate. Time: 2 to 3 hours.

A shed with a lip at the door is useless for a wheelbarrow or a mower. A short ramp fixes that in an afternoon. Here is how to build a shed ramp.

## 1. Measure the step

1. Measure the height from the ground to the shed floor.
2. Measure the door width.
3. Note anything in the way, like a sill or a post.

## 2. Work out the slope

1. Allow about one unit of rise to every six of run.
2. Keep the slope gentle for a loaded wheelbarrow.
3. Check the ramp will not block the door swing.

## 3. Choose the materials

1. Use treated timber for anything outdoors.
2. Choose exterior grade plywood for the deck.
3. Allow for grip strips.

## 4. Cut the side rails

1. Mark the slope angle on the timber.
2. Cut both rails to match.
3. Check they are identical.

## 5. Build the frame

1. Lay the rails on edge.
2. Fix cross pieces between them.
3. Keep the frame square.

## 6. Fix the frame to the shed

1. Rest the top of the ramp on the shed floor edge.
2. Fix through the rail into the shed base.
3. Check it cannot slide.

## 7. Add the deck

1. Cut the plywood to the frame.
2. Fix it down with screws every few inches.
3. Countersink the heads so nothing catches.

## 8. Add grip strips

1. Fix battens across the ramp.
2. Space them evenly up the slope.
3. Keep them low enough not to trip a wheel.

## 9. Support the bottom

1. Check the ramp does not rock at the base.
2. Add a cross piece or a gravel pad under it.
3. Level the ground where it lands.

## 10. Test and treat

1. Roll a wheelbarrow up and down.
2. Check for flex or movement.
3. Treat the timber with a suitable finish.

## Ramps that stay put in the rain

A timber ramp on wet ground slides, and one on soft ground sinks at the bottom edge. Bed the foot of the ramp on a shallow gravel pad, and fix the top rail to the shed floor edge rather than resting it there. Treat the deck with a finish that keeps grip, not a gloss. Check the whole thing after the first hard rain and tighten anything that has moved.

## Common mistakes

- A slope so steep a loaded wheelbarrow runs away.
- No grip strips, so the deck is slick when wet.
- Fixing the ramp to nothing, so it slides.
- Untreated timber that rots within a year.
- Deck screws left proud, catching wheels.

## Related guides

- [How to Build a Concrete Pad for a Shed](/guides/how-to-build-a-concrete-pad-for-a-shed/)
- [How to Install a Gravel Pad Under a Shed](/guides/how-to-install-a-gravel-pad-under-a-shed/)
- [How to Install a Gutter on a Shed](/guides/how-to-install-a-gutter-on-a-shed/)
- [How to Level a Shed](/guides/how-to-level-a-shed/)
- [How to Anchor a Shed to the Ground](/guides/how-to-anchor-a-shed/)
- [How to Paint a Shed](/guides/how-to-paint-a-shed/)

## FAQ

**How steep should a shed ramp be?**
About one in six. Gentle enough to push a loaded wheelbarrow up comfortably.

**What plywood should I use?**
Exterior grade, and treat the edges.

**Can I use the ramp for a ride on mower?**
Only with a stronger frame and a longer, gentler slope.

**Do I need grip strips?**
Yes on any ramp that gets wet. They stop wheels slipping.

When to call a pro: The step up is more than about a foot, or the ramp has to carry a ride on mower regularly.
Safety: Wear safety glasses when cutting and drilling, and clamp the lumber rather than holding it. Keep the finished slope gentle, because a steep ramp is harder to control a loaded wheelbarrow on than a step.

General information only, not professional advice. Rules vary by state and city. First Home Fixes, https://firsthomefixes.com
