# How to Install Cement Board Underlayment

Source: https://firsthomefixes.com/guides/how-to-install-cement-board-underlayment/
Summary: How to install cement board underlayment for tile: set it in thinset, stagger the joints, screw it down, and tape them before tiling.
Difficulty: Moderate. Time: 4 to 6 hours for one room.

Knowing how to install cement board underlayment is the step that decides whether a tile floor lasts. Tile is rigid and does not bend, so any movement under it becomes a crack. Cement board in a full bed of thinset spreads the load and gives the tile a stable surface.

The common mistake is screwing the board dry to the subfloor with no thinset under it. That leaves voids, and a void under a tile is where a crack starts.

## 1. Check the subfloor stiffness

Tile needs a floor that does not deflect much. Check the joist size, spacing, and span, and use a deflection calculator or ask a supplier. If the floor is not stiff enough, tile will crack no matter what underlayment you use. This is the check people skip.

## 2. Check the subfloor flatness

Set a straightedge across the floor in several directions and measure the dips. Most tile needs the surface flat within about an eighth of an inch over 10 feet. Flatten with a patching compound before the cement board goes down.

## 3. Fix the subfloor first

Screw down any loose plywood or boards, and replace soft or water damaged sections. Squeaks and movement under the cement board become cracks in the tile. Use screws long enough to bite into the subfloor but not so long they come through from below.

## 4. Plan the layout

Dry fit the panels so the joints are staggered and never line up in a cross. Leave a small gap between panels and a gap at the walls. Cut the panels with a scoring tool or a carbide blade, and cut around obstructions before you set anything in thinset.

## 5. Mix the thinset

Mix a modified thinset to the consistency of peanut butter and let it slake as the bag says. Use a trowel with a notch sized for the panel, usually a quarter inch square notch. Mix only what you can use in about 20 minutes.

## 6. Spread thinset and set the panel

Spread thinset over an area you can cover before it skins over, then press the panel into it and walk or roll it down so the thinset spreads evenly. Lift a corner to check coverage; the panel should be fully supported, not sitting on ridges.

## 7. Screw the panel down

Screw the panel with cement board screws at about 8 inches on center across the field and closer at the edges. Drive them just below the surface without breaking the board. Start in the center and work outward so the panel does not trap air at the edges.

## 8. Stagger and continue

Set the next panel so its joint does not line up with the one beside it, and keep the same sequence. Leave a small gap at the walls, which the baseboard or tile will cover. Work your way out of the room so you do not walk on fresh thinset.

## 9. Tape the joints

Fill the joints with thinset and embed mesh tape while the thinset is still wet, then smooth it with the trowel. A thin skim over the whole surface helps, but the joints are the important part. Let it cure before tiling.

## 10. Clean up and check

Scrape off high spots of thinset and vacuum the surface. Check flatness again with a straightedge. Any screw head that is proud has to be driven deeper, since a proud screw holds a tile off the surface and cracks it.

## Common mistakes

- Screwing the board down without thinset under it, leaving voids.
- Lining up panel joints in a cross, which cracks along the seams.
- Using drywall screws, which rust and do not hold as well.
- Leaving gaps at the walls too wide, or no gap at all.
- Skipping the mesh tape on the joints.
- Tiling over a subfloor that is not stiff or flat enough.

## FAQ

**Does cement board need thinset under it?**
Yes, for floors. A full bed of thinset fills voids so the board and the tile above it are fully supported.

**What screws do I use for cement board?**
Screws made for cement board, which have a corrosion resistant coating and a head that sinks without tearing the panel.

**Can I tile directly on plywood instead?**
Not reliably. Use an uncoupling membrane or cement board made for the purpose, and check the subfloor stiffness first.

**How do I cut cement board?**
Score the face with a carbide scoring tool and snap it, or cut with a carbide blade in a saw. Cut outside or with a vacuum, since the dust is fine silica.

**Do I need to tape cement board joints?**
Yes. Mesh tape embedded in thinset stops the joints from telegraphing through the tile.

When to call a pro: The subfloor is soft or out of flat by more than a quarter inch, or the joist structure has not been checked for tile, since tile needs a stiff floor.
Safety: Cement board dust contains silica. Cut outside or with a vacuum, and wear a dust mask and eye protection. Panels are heavy and awkward, so lift with your legs and get help with full sheets. Drills and drivers can kick, so keep both hands on the tool.

General information only, not professional advice. Rules vary by state and city. First Home Fixes, https://firsthomefixes.com
