# How to Level a Subfloor Before Installing Flooring

Source: https://firsthomefixes.com/guides/how-to-level-a-subfloor-before-installing-flooring/
Summary: How to level a subfloor before installing flooring: find high and low spots, sand the highs, fill the lows, and recheck before the planks go down.
Difficulty: Moderate to hard. Time: A day or more depending on the area, plus curing time.

Every flooring problem that shows up a year after installation, the click that opens, the plank that rocks, the hollow sound at a seam, started with a floor that was not flat. The difference between a floor that stays quiet and one that creaks is how to level a subfloor before installing flooring. New flooring does not fix an uneven subfloor. It copies it.

Learning how to level a subfloor before installing flooring is mostly learning to measure properly and to be patient with curing times. Here is the process.

## 1. Know the difference between flat and level

Floors rarely need to be truly level. They need to be flat, meaning no sudden dips or humps over a short distance. An old house can slope gently and still take a new floor perfectly well.

The standard most flooring makers ask for is about 3/16 inch of variation over 10 feet, and about 1/8 inch over 6 feet. Check the instructions for your product, then measure against that number.

## 2. Find the high and low spots

Lay a long straightedge, or a straight board, across the floor in several directions. Where it rocks, you have a high spot. Where it sits flat but you can see daylight underneath, you have a dip.

Mark the spots with chalk and note the size of each one. Work in a grid so you cover the whole room, not just the middle.

## 3. Fix loose panels and squeaks first

Before any patching, walk the floor and listen. A squeak or a soft feel means the panel is loose, and our guide on [fixing squeaky floorboards](/guides/how-to-fix-squeaky-floors/) covers the repair from above.

- Screw the subfloor panels down into the joists, spacing screws 6 to 8 inches apart along the edges.
- Counter-sink the heads slightly so they do not stand proud.
- Replace any panel that is swollen, delaminated, or soft. Patching over rotten wood is wasted work.

## 4. Take down the high spots

High spots are usually a seam where two panels meet at different heights, a proud nail head, or a swollen edge.

1. Set any proud nails or screws with a hammer and a nail set.
2. Sand or plane the high seam with a belt sander or a floor edger.
3. Check with the straightedge as you go, and stop as soon as the rock is gone.
4. Vacuum the dust before moving to the next area.

Do not sand through the top veneer of plywood. If a seam is that bad, the panel edge needs to be re-secured or replaced.

## 5. Fill the low spots

For dips up to about a quarter inch, a trowel-applied floor patch compound is the right material. Mix it to a smooth, thick paste, spread it with a trowel, and feather the edges so there is no ridge.

Work in small areas and keep the trowel clean. A ridge at the edge of a patch is as bad as the dip it fills.

## 6. Use self-leveling compound for wide, deep dips

For a large low area, a pourable compound flows out to a flat surface. It needs a clean, primed floor and a dam at the edges so it does not run into other rooms.

Mix in the exact ratio on the bag, pour, and spread it with a spike roller or a trowel. Work quickly, because it starts to set in minutes. Never add extra water to make it flow further, since that weakens it.

## 7. Let it cure fully

Patching compound that looks dry may still be soft under the surface. Follow the bag for curing time, and give it longer in humid weather or a cool room.

Walking on it too early leaves dents that you will feel through the new floor.

## 8. Recheck the whole room

Go back over the entire floor with the straightedge, in both directions. Mark any remaining spots and patch them.

This second pass is the step most people skip. It is also the one that decides whether the new floor is quiet in a year.

## 9. Clean and protect before the new floor

Vacuum thoroughly, then wipe the floor with a damp cloth to pick up fine dust. Sweep the walls and ledges too, since dust falls.

If the new floor needs a vapor barrier or underlayment, install it now, and keep traffic off the patched areas until the flooring goes down.

## Common mistakes

- Checking only the middle of the room and missing a dip along a wall.
- Patching over a loose panel instead of fastening it.
- Mixing patching compound too wet so it shrinks and cracks.
- Walking on a patch before it cures.
- Sanding an old floor without checking for asbestos.

## FAQ

**Do I need to level a floor for carpet?**
Carpet hides small dips but not a ridge or a soft panel. Fix the high spots and any loose panels, and the pad will handle the rest.

**Can I use plywood to raise a low spot?**
Thin plywood or roofing felt can build up a shallow dip, but it can telegraph through a floating floor. Patching compound is usually safer.

**How much out of flat is acceptable?**
Check the maker's figure, commonly 3/16 inch over 10 feet. Anything more shows up as movement in the floor.

**How long does floor patch take to dry?**
Often a few hours for a thin patch and overnight for a thick one. Follow the bag and add time in humid conditions.

When to call a pro: The floor sags by inches, the joists feel soft or bouncy, or the whole room slopes. That is a structural question, not a surface one.
Safety: Wear a dust mask and eye protection when sanding, and ventilate the room. Sanding old flooring, adhesive, or patching compound can release silica dust, which is harmful over time. If the home is older and there is any chance the old floor or mastic contains asbestos, stop and have it tested rather than sanding it. Keep the work area clear and never walk on wet patching compound.