How to Mix a Small Batch of Concrete
Part of: Outdoors and garage

- Difficulty
- Easy
- Time
- 30 to 60 minutes
- Tools
- Wheelbarrow or mixing tub, shovel or hoe, measuring bucket, water source, gloves, dust mask, safety glasses, trowel, float
- Call a pro if
- You are pouring a footing, a slab or anything structural, since the mix, reinforcement and curing need to be right.
In this guide
- Wear protection
- Chemical safety
A small batch covers a fence post, a step repair or a paver base. The trick is measuring by volume and adding water slowly. How to mix a small batch of concrete starts with how much you need, working out the cubic feet of the hole or form first.
1. Work out how much you need
1. Measure the hole or form in feet.
2. Multiply length by width by depth for cubic feet.
3. A 40 pound bag of mix yields about a third of a cubic foot.
4. Add a little extra for spillage.
2. Set up before mixing
1. Put the wheelbarrow or tub on level ground.
2. Have water within reach.
3. Keep the trowel and float nearby.
4. Wear gloves, glasses and a mask.
5. Keep the load small enough to control when you move it.
3. Measure by volume
1. Use a bucket for the mix and for the water.
2. Do not guess the water, which is the usual mistake.
3. Note the ratio on the bag for the product you bought.
4. Keep the bucket consistent, since scoop sizes vary.
4. Add water gradually
1. Put most of the water in first.
2. Add the dry mix and start turning it.
3. Add the rest of the water a little at a time.
4. Aim for the consistency of thick oatmeal.
5. Too wet mix is weak and cracks.
5. Mix thoroughly
1. Turn the mix from the edges into the middle.
2. Keep going until there are no dry pockets.
3. Scrape the corners of the tub.
4. Mix for about three minutes.
5. Turn from the edges into the middle, not in circles.
6. Place it promptly
1. Concrete starts setting in about 30 minutes.
2. Place it before it stiffens.
3. Tamp it into the form or hole to remove air pockets.
4. Do not overwork the surface.
7. Finish the surface
1. Level with a trowel or a straight edge.
2. Float the surface to close it.
3. Slope outdoor surfaces slightly so water runs off.
4. Brush a rough finish on paths for grip.
8. Cure it properly
1. Keep it damp for the first day.
2. Cover it with plastic in hot or windy weather.
3. Keep traffic off for at least 24 hours.
4. Full strength takes about a week.
9. Clean up
1. Wash tools before the concrete sets.
2. Rinse the wheelbarrow and shovel.
3. Dispose of leftover mix in the trash once hard, not down a drain.
4. Wash your hands and any skin contact.
Common mistakes
- Adding too much water, which weakens the concrete.
- Mixing more than you can place in half an hour.
- Dry pockets left in the mix.
- Letting tools dry with concrete on them.
- Pouring leftover mix down a drain.
FAQ
What ratio should I mix concrete at?
Follow the bag, since pre mixed products differ. A common general mix is one part cement to two or three parts sand and gravel, with water added gradually.
How much water does a small batch need?
Enough for a thick oatmeal consistency, added gradually. Too much water is the most common failure.
How long before I can use it?
Light traffic after 24 hours, full strength after about a week.
Can I mix concrete in a bucket?
Yes for very small amounts, using a sturdy bucket and a mixing paddle or a stout stick.
Related guides
- How to Make a Leaf Mold Bin: Learn how to make a leaf mold bin: frame a simple wire or wood bay, pack in damp leaves and leave them a year...
- How to Set Fence Posts in Concrete: Learn how to set fence posts in concrete: call 811, lay out the line, dig below the frost line, set each post...
- How to Use a Crowbar: Learn how to use a crowbar without wrecking the material: set the claw in a seam, pry in small lifts and...
- How to Use a File: Learn how to use a file on metal, wood and plastic: pick the right cut, hold it flat, and file in one...
- How to Use a Plumb Bob: Learn how to use a plumb bob to find true vertical: hang it from a steady point, let it settle and mark the...
