How to Tile a Floor
Part of: Floors, walls and doors

- Difficulty
- Moderate
- Time
- one weekend for one room
- Tools
- notched trowel, margin trowel, tile spacers, tile cutter or wet saw, mixing paddle and drill, bucket, level, tape measure, chalk line, rubber mallet, grout float, sponge, knee pads
- Call a pro if
- The subfloor is not stiff or flat, the room is large and out of square, or the tile is natural stone that needs sealing and a stiffer floor.
In this guide
- Wear protection
- Chemical safety
Knowing how to tile a floor is a project a careful beginner can do well. The tiles are simple to set; the skill is in the layout, the thinset consistency, and keeping the joints even across a whole room.
The order matters: substrate first, layout second, setting third, grout last. Skipping the layout is what leads to a sliver of tile at one wall and a job that looks amateur.
1. Prepare the substrate
The floor has to be flat, clean, and stiff. Use cement board or an uncoupling membrane over a wood subfloor, and a patching compound over concrete dips. Vacuum thoroughly, since thinset will not bond to dust.
2. Plan the layout from the center
Find the center of the room and snap a chalk line in each direction. Dry lay a row of tile along each line to see how the cuts land at the walls. Adjust the layout so the cut pieces at both walls are at least half a tile wide.
3. Check for square
Measure the diagonals of the room. If they are not equal, the room is out of square, and the layout should be adjusted so the cuts look even rather than the lines running perfectly parallel to one wall. A slightly angled layout can hide an out of square room.
4. Dry fit and count
Dry lay a section of the floor to check the pattern and spacing, and count the tiles you need. Mix tiles from several boxes as you go so any shade variation spreads across the room rather than collecting in one corner.
5. Mix the thinset
Mix to the consistency of peanut butter, let it slake, and remix. Use a trowel with a notch sized for the tile: a quarter inch square notch for most floor tile, larger for big format. Mix only what you can set in about 20 minutes.
6. Spread and comb the thinset
Spread thinset over a small area and comb it with the notched edge held at a consistent angle. Keep the ridges running one direction. Do not spread more than you can cover before it skins over, which takes about 10 minutes in a warm room.
7. Set the first tile on the line
Press the first tile into the thinset with a slight twist and a firm push, aligning it with the chalk lines. Check it with a level. This tile sets the whole field, so take the time to get it right.
8. Work outward and check as you go
Set the next tiles along the lines with spacers between them, then fill in the field. Check level and lippage every few tiles with a straightedge across the joints. Pull a tile and add thinset if the back is not fully covered.
9. Make the cuts
Measure each cut tile from the joint, not from the wall, and mark it on the face. Cut with a wet saw for straight cuts and a nipper or grinder for curves and notches. Cut edges go against the wall where baseboard or trim will hide them.
10. Let it cure before grouting
Keep traffic off the floor for at least 24 hours, and longer for large tile or cool rooms. Then grout the joints, clean the haze before it dries, and seal the grout once it has cured if the room is wet or heavily used.
Common mistakes
- Starting at a wall instead of a center line, which leaves a sliver at the far wall.
- Spreading too much thinset, so it skins over and the tile will not bond.
- Not checking coverage, which leaves voids that crack underfoot.
- Using too little thinset and relying on spacers to hold the height.
- Walking on the floor before the thinset cures.
- Grouting before the thinset is fully set, which weakens both.
FAQ
Can I tile over existing tile?
Sometimes, with a product made for it and a sound, clean, scuffed surface. Removing the old tile usually gives the better result.
How long before I can walk on new tile?
24 hours for light traffic on most thinset, and grout needs its own cure time. Heavy traffic should wait longer.
Do I need spacers if the tile has built in lugs?
Lugs keep a minimum joint, but spacers still help keep the lines straight across a large floor.
What size notch trowel should I use?
A quarter inch square notch for most floor tile, and a larger notch for tile over 12 inches or for uneven substrates.
How do I stop lippage between tiles?
Use a flat substrate, consistent thinset, and check with a straightedge as you go. Lippage clips help on large format tile.
Related guides
- How to Replace a Cracked Floor Tile: How to replace a cracked floor tile: break out the old one, clean the bed, set a matching tile, and grout it...
- How to Measure a Room for Flooring: How to measure a room for flooring: sketch it, measure at the widest points, add waste for cuts, and turn the...
- How to Grout a Tile Floor: How to grout a tile floor: work grout in diagonally, clean the haze before it dries, and cure the joints so...
- How to Install Carpet Tiles: How to install carpet tiles: prep the floor, set a chalk line, lay the first tile square, and stagger the...
- How to Install Cement Board Underlayment: How to install cement board underlayment for tile: set it in thinset, stagger the joints, screw it down, and...