How to Install a Drain Cleanout Access

4 min read · Updated 28 November 2026 ·

Part of: Tools and everyday fixes

Simple illustration for the guide How to Install a Drain Cleanout Access
Difficulty
Advanced
Time
2 to 3 hours
Tools
A pipe cutter or saw, a wye fitting, couplings, primer and cement, a plug
Call a pro if
The line is cast iron, the cleanout is on the main sewer, or code requires a permit for the cut-in, since main-line work is inspected work.
In this guide
  1. Choose the location
  2. Confirm the pipe and plan the cut
  3. Cut out the section
  4. Dry-fit the wye and couplings
  5. Glue the assembly
  6. Test the new cleanout
  7. Use and maintain it
  8. Common mistakes
  9. FAQ
  10. When to call a pro
Safety. Drain lines carry contamination; gloves, eye protection and no open flames near sewer gas. Support the pipe on both sides of the cut so the run does not sag when the section comes out.

Every serious drain clog story ends with "if only there were a cleanout." A cleanout is a capped access point that lets an auger enter the line directly, turning a wall-opening repair into a ten-minute clearing. How to install a drain cleanout is a cut-in wye fitting with a plug, and this guide covers the placement, the cut and the seal.

1. Choose the location

Placement decides usefulness.

1. Put the cleanout where clogs happen: at the base of stacks, before long horizontal runs and at direction changes.

2. The opening must be accessible; a cleanout behind finished drywall needs an access panel.

3. Aim the wye's branch toward the direction of flow so the auger travels downstream.

4. Code requires cleanouts at specific points; the local rules are worth a check before cutting.

2. Confirm the pipe and plan the cut

Know the line before opening it.

1. Identify the material: PVC, ABS or cast iron, since the fittings and methods differ.

2. Measure the section to remove; it equals the wye's length plus coupling allowances.

3. Mark the cuts square around the pipe.

4. Plan the fitting orientation so the branch faces up or out, never down.

3. Cut out the section

The point of no return.

1. Support the pipe both sides of the cut area.

2. Cut at the marks; a plastic pipe saw or a cutter makes the square ends fittings need.

3. Remove the section and clean the ends.

4. Expect residual water; the bucket catches the cup the low spot held.

4. Dry-fit the wye and couplings

The rehearsal.

1. Slide the couplings on, then the wye, checking the branch direction.

2. Verify the slope of the run is unchanged; the new fitting must not create a belly.

3. Mark the alignment across pipe and fittings with a marker.

4. Everything should assemble with firm hand pressure before any cement.

5. Glue the assembly

The permanent weld.

1. Prime both surfaces, then cement, working one joint at a time.

2. Push together with a quarter twist to the alignment marks and hold thirty seconds.

3. The branch gets its threaded plug, taped, once the glue sets.

4. Respect the cure time before any water test; rushed glue joints weep.

6. Test the new cleanout

The proof.

1. Open the plug and check the passage with a light; the branch should show a clear path downstream.

2. Reseat the plug and run water through the line for several minutes.

3. Inspect every new joint with a dry paper towel.

4. The plug seats hand-tight plus a quarter turn; it will need to come off someday.

7. Use and maintain it

The payoff.

1. Next clog: remove the plug, auger downstream, reseat; how to use a drain auger covers the clearing.

2. Keep the plug accessible and its location noted for the household.

3. A weeping plug needs new tape, not more force.

4. Pair the cleanout with good habits, like strainers and no grease down the kitchen line, so it stays a rare visitor.

Common mistakes

FAQ

How do you add a cleanout to a drain line?

Cut out a section of the drain, fit a wye with its branch aimed downstream, glue it in with couplings, and cap the branch with a taped threaded plug. Two to three hours on accessible plastic pipe.

Where should a drain cleanout be installed?

At the base of vertical stacks, ahead of long horizontal runs and at major direction changes, always accessible. Local code lists required locations; those are the minimum, not the limit.

Does every drain line need a cleanout?

Code requires them at key points on the drain system. Beyond code, any long run or problem stretch earns one; the cleanout is what turns a future clog into a ten-minute job.

Can you install a cleanout in cast iron?

It is done with shielded couplings and a cast-iron wye, but cutting cast iron is heavy, specialist work. Most homeowners hand cast-iron cleanouts to a plumber.

how to install a drain cleanoutdrain cleanout installationadd cleanout to drain linecleanout plug accessinstall sewer cleanout

Related guides

How to Install a Backwater ValveDrains and SewersHow to Install a Backwater ValveHow to install a backwater valve: choose the access point, set the valve in the main drain line and stop sewage backups.Simple illustration for the guide How to Cap a Drain Line: Seal an Unused DrainPlumbingHow to Cap a Drain Line: Seal an Unused DrainHow to cap a drain line: seal an unused drain stub with the right cap or test plug so sewer gas and water stay put.How to Install a Pot Filler FaucetPlumbingHow to Install a Pot Filler FaucetHow to install a pot filler: run a cold line behind the stove, mount the faucet solidly and leak-check the swing joints.How to Install a Pull Down Attic LadderFirst HomeHow to Install a Pull Down Attic LadderHow to install a pull down attic ladder: cut the opening to the right size, frame it solid, set the unit square, and adjust the legs for a safe climb.Simple illustration for the guide How to Fix a Basement Floor Drain BackupDrainsHow to Fix a Basement Floor Drain BackupHow to fix a basement floor drain backup: tell a local clog from a main-line blockage, clear what you can and know the pro line.